Skip to content

Bridge Building 2016

Congrats to our latest batch of super bridge engineers. During term 4 we designed and built our pop-stick bridges to span a divide of 40cm and withstand as much forceĀ as possible before failure. This years winner (no spoilers!) held a never before seen load of over 30kg. Thanks to everyone who participated in the day!

Bridge Building 2016 from Abe Moore on Vimeo.

Published inUncategorized
Skip to toolbar